As speaker
-
Una caja llena de problemas: optimización en terminales marítimas de contenedores
R. Alvarez-ValdesOPERATIONAL INVESTIGATION PLENARY (SIXTO RIOS) Ramón Álvarez-Valdés, Thursday June 09, 4:00 PM-5:10 PM
-
Un algoritmo Beam Search para el problema de premarshalling con tiempos de grúa
C. Parreño-Torres, R. Alvarez-Valdes, F. Parreño TorresGT09 Heuristics I. Heuristics and metaheuristics, Wednesday June 08, 4:00 PM-5:20 PM
As coauthor
-
El problema de la asignación de atraques considerando el tiempo de movimiento de las grúas
J. F. Correcher Valls, F. Perea, R. Alvarez-ValdesGT10 Transport I, Tuesday June 07, 12:00 PM-1:20 PM
-
Grid operation-based outage maintenance planning
F. Parreño Torres, R. Alvarez-Valdes, C. Parreño-TorresInvited Session APDIO-SEIO. Operations Research and Sustainability, Tuesday June 07, 6:40 PM-8:00 PM
-
A vehicle routing pickup problem with packing constraints: First Mile logistics under disruptions
I. Giménez Palacios, F. Parreño Torres, R. Alvarez-Valdes, C. Paquay, B. Brito Oliveira, M. A. Carravilla, J. F. OliveiraInvited Session APDIO-SEIO. Operations Research and Sustainability, Tuesday June 07, 6:40 PM-8:00 PM
-
Resolviendo el problema de rutas y cargas de pallets en camiones
M. T. Alonso Martínez, A. Martínez Sykora, R. Alvarez Valdés, F. Parreño TorresGT09 Heuristics II. Heuristics and metaheuristics, Wednesday June 08, 5:20 PM-6:40 PM
-
Un algoritmo Beam Search para el problema de premarshalling con tiempos de grúa
C. Parreño-Torres, R. Alvarez-Valdes, F. Parreño TorresGT09 Heuristics I. Heuristics and metaheuristics, Wednesday June 08, 4:00 PM-5:20 PM